New Electricity Connection in Pakistan: Application, Cost & Timeline

New house, new shop, or a separate portion that needs its own meter? Getting a new electricity connection in Pakistan is a paperwork process with a predictable sequence: apply, survey, demand notice, meter installation, first bill. This guide walks through every step — documents, costs, and realistic timelines — so nothing stalls your application.
Documents You’ll Need

Gather these before you visit the DISCO office — an incomplete file is a common reason applications stall:
| Document | Details |
|---|---|
| CNIC copy | Applicant’s computerized national identity card |
| Property proof | Registry, allotment letter, or registered rent agreement |
| Wiring test report | From a licensed electrician/contractor confirming internal wiring is safe |
| Neighbor’s bill copy | Any nearby bill — helps the DISCO locate your pole/area |
| Photographs | Passport-size photos of the applicant |
Applying for a commercial connection? You’ll additionally need your business registration / NTN and the load requirement in kW.
Connection in 5 Steps

| Step | What Happens | Typical Time |
|---|---|---|
| 1. Apply | Submit the application with documents at your DISCO’s customer service center (you can also apply online on the ENC portal at enc.com.pk) | Day 1 |
| 2. Survey | DISCO team visits the premises, checks pole/transformer feasibility and records the required load | 3–10 days |
| 3. Demand notice | You receive the demand notice: connection charges + security deposit based on sanctioned load — pay at any bank | Pay within the notice validity |
| 4. Meter installation | DISCO installs the meter and energizes the connection | 7–15 days after payment |
| 5. First bill | Your 14-digit reference number is issued — check all future bills online | Next billing cycle |
Plan for about a month from application to energized meter, if documents are complete and the demand notice is paid promptly. Incomplete files and unpaid notices are common causes of delay.
What It Costs
Connection charges scale with the sanctioned load (kW) you apply for — a standard domestic connection (up to 5 kW) costs the least; higher loads and three-phase connections cost more. The demand notice itemizes: connection fee, security deposit (refundable when the connection is permanently disconnected), and meter cost. Ask for the load you’ll actually use — oversanctioning raises both the upfront security deposit and your monthly fixed charges (see our reduce-your-bill guide, tip 8).
After You’re Connected
- Save your 14-digit reference number from the first bill — it’s permanent.
- Check every bill online: LESCO · MEPCO · FESCO · IESCO · GEPCO · PESCO · HESCO · SEPCO · QESCO · TESCO
- Learn to read the bill with our 2026 tariff guide.
Frequently Asked Questions
How long does a new electricity connection take in Pakistan?
Often about a month from a complete application to an installed meter, though it varies by area and load — faster if documents are complete and the demand notice is paid immediately.
What is a demand notice?
The DISCO’s bill for your connection: it lists the connection charges and security deposit based on your sanctioned load. Pay it at any bank within its validity period.
Can I apply for a new connection online?
Yes, through the ENC portal at enc.com.pk, but you’ll still visit the office or receive a visit for document verification and the feasibility survey.
Is the security deposit refundable?
Yes — it’s refunded when the connection is permanently disconnected and all dues are cleared.
Sources
Steps based on the ENC portal at enc.com.pk and Power Division guidance. Timelines and charges vary by area and load. Related: reference number guide, reduce your bill.